Final details

Image
Great meeting with Brendan to pin down some detail,next move out to tender!

Electrical connection

Image
I met the wonderful Richard of Western Power in site. We now embark on the road to having three phase electricity. On site, there used to be a constant water connection; it was a Reservoir after all. That connection has now been turned off. So, once the electricity is underway, we need to secure a conventional water connection. Jason Taylor of Severn Trent arranged for the water connection to be done at the same time as the electricity. Then the lockdown got in the way, and we are still waiting for electricity in June.