Posts

Showing posts from February, 2021

Interior taking shape

Image
 Ready for Beautiful Basements to fit the final tanking And the tanking nearing completion  Getting the sleeper wall levels right 

Extension roof

Image
Insulation and boarding being fitted by Lanecliffe Stace fitting guttering Ready for the rubber mat Rubber mat being fitted Now with skylights

And now some smaller gabions

Image
And some now filled

Skylights arrive

Image
Fitted  And of course a video The remainder are fitted

The Postman has found us

Image
 

The entrance being transformed

Image
 The entrance to the reservoir was marred by graffiti and some very strange pointing. We cleaned up the graffiti and Sean is doing stirling work on the pointing, by first grinding out what was there. The bricks are good quality Utopia from Stoke Next comes the repointing, a new lintel and adding three courses of blue bricks to the top and side walls. 

Snow stops play

Image