Posts

Showing posts from June, 2021

Stairs and entrance lobby

Image
 Mike has fixed brackets to the walls to carry the stair treads With chunky bolts In progress Done except for the oak treads At the top of the stairs is the original entrance lobby which needed tanking like the rest of the concrete structure Now Mike is fitting the floor joists prior to boarding

Garden update

Image
 Lavender hedge marking out the path is already attracting bees

Interior taking yet more shape

Image
  Bathrooms And wiring I think the electricians have been here

Cutting the final cores for extraction

Image
 Thanks to SACC Services of Nottingham

Creating ceilings

Image
 An N shape of Mdf 150mm x 150mm is secured along each wall to take led lighting, curtain rails and blinds  And the steel system

A wonderful reminder of the reservoir one year ago

Image
The outside as it was  and a video of the inside thanks to George Hamlyn Williams

Turf nearing completion

Image
 More turf