Roof joists going up
Lanecliffe do not hang about. This is the first morning’s work for a team of six Joists on the garage roof Flooring materials ready to be taken under cover The first joist ready for the extension roof And the roof covering The floor joists ready under cover Living room Garage Detail of garage roof The garage roof covering on before the snow The first boarding of the extension And the outside taking shape And the inside view of the living area with utility room at far end The roof above