Roof joists going up

 Lanecliffe do not hang about. This is the first morning’s work for a team of six  

Joists on the garage roof
Flooring materials ready to be taken under cover

The first joist ready for the extension roof
And the roof covering 
The floor joists ready under cover

Living room

Garage
Detail of garage roof
The garage roof covering on before the snow
The first boarding of the extension

And the outside taking shape
And the inside view of the living area with utility room at far end
The roof above





Comments

Post a Comment